• emotional_soup_88@programming.dev
    link
    fedilink
    English
    arrow-up
    13
    ·
    1 day ago

    If these are UTP, I demand a screenshot of cat /proc/net/dev and of some third party packet checking software that measures crosstalk and bit error. 😂

    • socsa@piefed.social
      link
      fedilink
      English
      arrow-up
      14
      ·
      1 day ago

      It still happens, the modern standards just handle these impairments better with line coding, active equalization, and more sensitive modem electronics. And obviously now we have shielding requirements in the PHY for 2.5G and above. But basically as DSP got cheaper and more compact, they were able to throw more compute at the problem which made a huge difference.

    • YiddishMcSquidish@lemmy.today
      link
      fedilink
      English
      arrow-up
      8
      arrow-down
      1
      ·
      1 day ago

      I don’t think I’ve seen a single data cable that didn’t have some kinda shielding since the early nineties.

      • rainwall@piefed.social
        link
        fedilink
        English
        arrow-up
        21
        ·
        edit-2
        1 day ago

        Most ethernet cable is UTP, literally “unshielded twisted pair.” Shielded cable is much more expensive and less physically flexible due to the metal jackets, so people dont tend to buy it by default.

        You can argue the jacket is shielding, but mostly ethernet cable is not shielded. The braiding will cause problems, but likely very minor ones based on the length of the the run that CRC will compensate for.

          • CannonFodder@lemmy.world
            link
            fedilink
            arrow-up
            6
            ·
            1 day ago

            Yes, in theory. But in practice it depends on the frequencies.
            Even if interference is insignificant, looping the wires around a metal core (which braiding does) creates a different impedance and can degrade the signal.

              • CannonFodder@lemmy.world
                link
                fedilink
                arrow-up
                7
                ·
                1 day ago

                It’s the wrapping of it around a ferrite core that does it. Surprisingly little can make a difference at certain clock rates. If you take a cat5 cable running 1G and loop it a dozen times in a 6" circle and put a metal screwdriver perpendicular to the loop in its center, you will see a spike in bit errors. Weaving one wire with another isn’t going to be as strong of an effect, and it’s fiendishly complicated in terms of an e/m problem, but it could easily be significant.

        • YiddishMcSquidish@lemmy.today
          link
          fedilink
          English
          arrow-up
          3
          ·
          1 day ago

          Granted I’m no network engineer. But I have made many of my own cat5’s through the years and I have not seen one since I was unable to legally drive.

  • friend_of_satan@lemmy.world
    link
    fedilink
    English
    arrow-up
    30
    ·
    edit-2
    1 day ago

    I hear you, but how often have you had to swap out a cable compared to how often have you had to deal with a rats nest? This isn’t a whole lot different than zip tying groups of cables together.

    IMHO this would be even better with 6 different colors per braid. Then you could trace a cable in a few seconds while also not having a rats nest.

    Edit: oops, this was supposed to be a reply to another comment.

    • alyqz
      link
      fedilink
      arrow-up
      19
      ·
      1 day ago

      Velcro is almost always the way to go with cable management. Zip ties can easily damage the wire and encourage messy wiring since you have to cut and replace every one to change a single wire.

      Wire lacing is OK for permanent installations, but good luck changing anything.

    • jaybone@lemmy.zip
      link
      fedilink
      English
      arrow-up
      16
      ·
      1 day ago

      But you can cut a zip tie. This is terrible if you have to replace a cable.

    • chaogomu@lemmy.world
      link
      fedilink
      English
      arrow-up
      12
      ·
      1 day ago

      You could also use tape tags on the ends, either color or number codes. Just mark both ends of each cable.

  • IsoKiero@sopuli.xyz
    link
    fedilink
    English
    arrow-up
    19
    ·
    1 day ago

    That’s actually not that awful. Time consuming and you better not need to change the loom after it’s done, but that doesn’t become spaghetti that easily. At least not until someone adds few individual (and way too long) cables tangled to those.

    • socsa@piefed.social
      link
      fedilink
      English
      arrow-up
      3
      ·
      1 day ago

      It’s awful considering braided cable sleeve is orders of magnitude cheaper than IT labor.

      • IsoKiero@sopuli.xyz
        link
        fedilink
        English
        arrow-up
        1
        ·
        23 hours ago

        I’d guess braiding is not that much more time consuming than fighting cables in a sleeve. Personally I’d use velcro-straps, but on our team there’s always too little time to actually make things look decent, so pretty much all is in various stages of spaghetti, depending on which cabinet you’re looking for.

  • anton@lemmy.blahaj.zone
    link
    fedilink
    English
    arrow-up
    10
    ·
    1 day ago

    I actually had to teach someone in my uni course how to braid power cables for a induction motor. Do they not teach basic skills in preschool anymore?

  • Pommes_für_dein_Balg@feddit.org
    link
    fedilink
    arrow-up
    10
    arrow-down
    2
    ·
    edit-2
    1 day ago

    unpopular opinion:
    The effort of “tidying up” cables is never worth it.
    You’ll always end up having to change something and your sophisticated cable management turns a 5 minute job into a 1 hour job, as you open zip ties and dig out cables.
    Just use the correct cable length, plug that shit in in a sensible order, label both ends with numbered tape, and let it look messy.

    • rainwall@piefed.social
      link
      fedilink
      English
      arrow-up
      17
      ·
      edit-2
      1 day ago

      The first step is using correctly sized ethernet cables. Dont use a 12 ft cable for a 3 ft run. There shouldnt be more than a foot of slack in general. You dont need to “tidy” excess you dont have.

      Then, for when you do need to tidy cables, use velcro ties, not zip ties. Ideally, you still label all the runs, especially the long ones. Seems a bit redundant for 3ft, but its still helpful.

    • 0x0@infosec.pub
      link
      fedilink
      English
      arrow-up
      3
      ·
      1 day ago

      At least put in the minimum effort of trying to follow the original path (assuming someone worth their salary actually was involved in the making of the site.).

      Youd be surprised at the difference in mess from just plugging ‘a to b’ and ‘a to b via c’ no matter how many techs having been involved.

      • Pommes_für_dein_Balg@feddit.org
        link
        fedilink
        arrow-up
        1
        ·
        1 day ago

        I’d obviously plan the initial setup, start with connecting ports close together via short cables, then put the longer connections on top, avoid unnecessary crossings.
        And when switching out a cable, look for the most direct path

        • 0x0@infosec.pub
          link
          fedilink
          English
          arrow-up
          4
          ·
          1 day ago

          Cable trays is the magic word. Any rack larger than 2u that see frequent patching need them no matter what accounting thinks.

  • Newsteinleo@infosec.pub
    link
    fedilink
    English
    arrow-up
    7
    ·
    1 day ago

    God forbid you have to swap out a cable or a port does on the switch. You will spend 20 min trying to figure out what cable goes where

    • ButteryMonkey@piefed.social
      link
      fedilink
      English
      arrow-up
      4
      arrow-down
      1
      ·
      1 day ago

      Or you could mark the bad one, replace the whole set, then unbraid and toss the marked one later in a dumb meeting you have better things to do than attend or something :p

      • Newsteinleo@infosec.pub
        link
        fedilink
        English
        arrow-up
        4
        ·
        1 day ago

        You still have trace each cable between the patch panel and the switch or thing could end up on the wrong subnet.