• Zagorath@aussie.zoneOP
    link
    fedilink
    English
    arrow-up
    11
    ·
    8 months ago

    14 billion to induce more demand on a corridor that already has eight lanes of road.

    Yet they can’t get the funding to do the last 500 metres of surface-level bikeway to complete the North Brisbane Bikeway from the CBD all the way to Redcliffe.

  • theroff@aussie.zone
    link
    fedilink
    arrow-up
    7
    ·
    8 months ago

    I wonder if they’re planning road diets on the surface. Maybe some bike lanes, bus lanes and wider footpaths.

    (For the record I highly doubt that, but if such a wasteful project were to go ahead that would be the best concession IMO).