Released as Sound Transit reaches 30% design on the future 3 Line, the new renderings show the full 3.9 mile line that will run between SoDo and Alaska Junction until connecting with the rest of the light rail network as soon as 2042.
Released as Sound Transit reaches 30% design on the future 3 Line, the new renderings show the full 3.9 mile line that will run between SoDo and Alaska Junction until connecting with the rest of the light rail network as soon as 2042.
Damn, no brand new giant Automated Light Rail system?