• @kurap1ka@lemmy.world
    link
    fedilink
    English
    38 months ago

    Viable space program? Starlink is shitting all over our orbit, Artemis is fucked because SpaceX needs 12 or more launches to refuel one flight to the moon. Additionally the whole development is like tesla full self driving, always promise for next year and don’t deliver. The moon was to be reached in 2024 and as of now SpaceX is celebrating failed test launches as win… Years behind schedule…

    • @accideath@lemmy.world
      link
      fedilink
      English
      18 months ago

      I didn’t say spacex was perfect. However, we were relying entirely on the Russians to get astronauts to and from the ISS since 2011 until spaceX built the crew dragon.

      That musk is exaggerating everything they do is a very different story but that’s also not what I’m talking about.